Page 10 - QCS2024
P. 10
2024 Section 00: Preface Page 6
Part 01: Contents

Part 5 Welding
Part 6 Bolting
Part 7 Accuracy of Fabrication
Part 8 Erection
Part 9 Accuracy of Erected Steelwork
Part 10 Protective Treatment

Part 1 General
Part 2 Materials Classification
Part 3 Metal Doors and Windows
Part 4 Architectural Metal Work
Part 5 Light Metal Support and Cladding Support
Part 6 Workmanship

Part 1 General
Part 2 Wood Treatment
Part 3 Structural Timber (Rough Carpentry)
Part 4 Architectural Timber (Finished Carpentry, Millwork)
Part 5 Joinery
Part 6 Fasteners and Adhesives
Part 7 Ironmongery (Hardware)

Part 1 General
Part 2 Water Distribution
Part 3 Plumbing Pipework in Trenches
Part 4 Cold Water Storage
Part 5 Hot Water Storage
Part 6 Commissioning of Systems
Part 7 Plumbing for Gases

Part 1 General
Part 2 Internal Drainage Works
Part 3 External Drainage Works
Part 4 Drainage Pipes in Trenches
Part 5 Structures Related to Drainage Work
Part 6 Surface Water Drainage
Part 7 Commissioning of Systems

Part 1 General Provisions for Electrical Installation
Part 2 LV Factory Built Assemblies (FBA’s)
Part 3 Protective Devices
Part 4 Motor Starters
   5   6   7   8   9   10   11   12   13   14   15