Part 1 Introduction
Part 2 Use and Maintenance of the Site
Part 3 Site Access and Entry onto the Site
Part 4 Protection
Part 5 Interference
Part 6 Project Meetings
Part 7 Submittals
Part 8 Building Demolition and Waste Management
Part 9 Materials
Part 10 Welfare, Occupational Health and Safety
Part 11 Engineer’s Site Facilities
Part 12 Contractor’s Site Facilities
Part 13 Setting Out of the Works
Part 14 Temporary Works and Equipment
Part 15 Temporary Controls
Part 16 Traffic Diversions
Part 17 Project Co-ordination
Part 18 Other Contractors
Part 19 Regulatory Requirements
Part 20 Clearance of the Site
Part 21 Final Inspection and Handover Procedures
Part 22 Design and Supervision Consultant Quality Requirement
Part 23 Construction Dewatering
Part 24 International Built Sector Standards.
Part 25 Public Satisfaction.

Part 1 General
Part 2 Submittals
Part 3 Contractor’s Quality Personnel
Part 4 Document and Data Control
Part 5 Quality Records
Part 6 Quality Audits
Part 7 Inspection and Test
Part 8 Materials
Part 9 Nonconformity Monitoring
Part 10 Laboratories
Part 11 Site Meetings and Reports
Part 12 Risk Identification and Management
Part 13 Failure by The Contractor to Meet Acceptable Quality Performance
Part 14 Suspension of Work
Part 15 APPENDIX A – Sampling and Testing Frequencies
Part 16 APPENDIX B – Templates
(Contractors Project Quality Plan Template, Contractors Inspection And Test
Plan Template, and Quality Non-conformance Template)