Page 6 - QCS2024
P. 6
2024 Section 00: Preface Page 2
Part 01: Contents
Part 1 General
Part 2 Boreholes
Part 3 Pits and Trenches
Part 4 Soil Sampling
Part 5 in-Situ Testing, Instrumentation and Monitoring
Part 6 Laboratory Testing
Part 1 General Requirements for Piling Work
Part 2 Concrete Works for Piling
Part 3 Shadow Foundations
Part 4 Deep Foundations
Part 5 Retaining Structures
Part 1 General
Part 2 Aggregates
Part 3 Cementitious Materials
Part 4 Water
Part 5 Admixtures
Part 6 Property Requirements
Part 7 Concrete Plants
Part 8 Transportation and Placing of Concrete
Part 9 Formwork
Part 10 Curing
Part 11 Reinforcement
Part 12 Joints
Part 13 Inspection and Testing of Hardened Concrete
Part 14 Protective Treatments for Concrete
Part 15 Hot Weather Concreting
Part 16 Miscellaneous
Part 17 Structural Precast Concrete
Part 18 Prestressed Concrete
Part 19 Testing of Water Retaining Structures
Part 20 Personnel Qualifications and Certification
Part 21 Post-installed Anchors and Reinforcement Bars
Part 1 General
Part 2 Site Clearance
Part 3 Earthworks
Part 4 Unbound Pavement Materials
Part 5 Asphalt Works
Part 6 Concrete Road Pavements
Part 7 Asphalt Plants
Part 8 Recycled and Stabilised Road Materials
Part 9 Recycled Materials for Roadworks
Part 01: Contents
Part 1 General
Part 2 Boreholes
Part 3 Pits and Trenches
Part 4 Soil Sampling
Part 5 in-Situ Testing, Instrumentation and Monitoring
Part 6 Laboratory Testing
Part 1 General Requirements for Piling Work
Part 2 Concrete Works for Piling
Part 3 Shadow Foundations
Part 4 Deep Foundations
Part 5 Retaining Structures
Part 1 General
Part 2 Aggregates
Part 3 Cementitious Materials
Part 4 Water
Part 5 Admixtures
Part 6 Property Requirements
Part 7 Concrete Plants
Part 8 Transportation and Placing of Concrete
Part 9 Formwork
Part 10 Curing
Part 11 Reinforcement
Part 12 Joints
Part 13 Inspection and Testing of Hardened Concrete
Part 14 Protective Treatments for Concrete
Part 15 Hot Weather Concreting
Part 16 Miscellaneous
Part 17 Structural Precast Concrete
Part 18 Prestressed Concrete
Part 19 Testing of Water Retaining Structures
Part 20 Personnel Qualifications and Certification
Part 21 Post-installed Anchors and Reinforcement Bars
Part 1 General
Part 2 Site Clearance
Part 3 Earthworks
Part 4 Unbound Pavement Materials
Part 5 Asphalt Works
Part 6 Concrete Road Pavements
Part 7 Asphalt Plants
Part 8 Recycled and Stabilised Road Materials
Part 9 Recycled Materials for Roadworks